Carriageway resurfacing Folkestone
Repair Winter Damaged Carriageways
Project Strategic CHALLENGES
Project SYN0PSIS
This project was in response to the damaged highways across Kent. Steadline undertook a project in the Ashford and Folkestone & Hythe Areas of East Kent to repair winter damaged carriageways over a 3 year period. Works were both programmed and responsive in nature and requiring traffic management design and installation from road closures and diversions to multi-phase traffic signals.
Surface repairs were undertaken utilising Steadline in-house resources which varied from whole carriageway surfacing to small patch repairs to high standards. Building on this success a further 2-year contract extendable to 4 years has recently been awarded.
More Projects From Steadline Ltd
Peckham Rye Station London Renovation
Steadline were employed to complete staircase work and provide direct access to the waiting room from ground level.​
Wellington Crescent Ramsgate Weather Protection
As a result, our client was left with the wall fully restored and shielded from moisture on both sides ensuring its stability and long term integrity.
Teston Bridge Rebuild
Teston Bridge is a 15th Century Grade 1 listed structure over the river Medway. This project was to repair the bridge after a vehicle damaged it.